A brand-new house can still have plumbing faults, and most of them show up inside the first year. Builders push hard toward handover, half a dozen trades work over the top of each other, and the ground under a fresh slab is still settling. A lot of what goes wrong in that first stretch isn’t the homeowner’s bill to pay, though. It just has to be reported properly, and on time.

The plumbing problems that turn up most in new builds

A few show up in the first week, while others hide until the first wet winter. Here’s what plumbers see again and again in newer homes:

  • Drains that run slow from day one, usually because render slurry, grout or tile offcuts went down a floor waste during the fit-out
  • Weeping fittings under vanities and kitchen sinks
  • Low pressure at one tap only (nearly always an aerator or mixer cartridge clogged with construction grit)
  • Water hammer, that loud bang when the dishwasher valve snaps shut
  • Downpipes never properly connected to stormwater, which nobody notices until the first big storm
  • Lukewarm showers from a tempering valve set too low

Most of those sound minor. Left alone, a slow drip under a vanity can swell a particleboard cabinet base within a few months, and a downpipe dumping water against the edge of a slab is how damp and movement problems start.

Why new homes end up with these faults

Nobody sets out to build a house with a leaking trap. The real culprit is sequencing. Plumbers rough in the pipes early, then tilers, cabinet makers, plasterers and landscapers spend months working around them before final fit-off. Pipes get knocked. Drains get treated as a rubbish chute. And a gully trap that sat at the right height on handover day can end up buried once the garden beds go in, which is a bigger deal than it looks, because the overflow relief gully is the point designed to let sewage spill outside rather than up through your shower.

Fresh fill settles over the first couple of years as well. Rigid pipe joints don’t love that.

Newer estates in Melbourne’s north-west see plenty of these issues, and a plumber in Sunbury who works those estates regularly can usually tell within a few minutes whether a fault traces back to the build or to something that happened afterwards. Getting that answer in writing early makes the conversation with your builder a lot shorter.

Who pays: the builder, the plumber or you?

In Victoria, the builder is generally on the hook for defects in the work they contracted to deliver, and that includes plumbing done by their subcontractor. The Domestic Building Contracts Act gives every domestic building contract a set of built-in warranties, including that the work is carried out in a proper and workmanlike manner and complies with the law. Those warranties apply whether the contract spells them out or not.

Under Victoria’s Building Act, a building action generally can’t be brought more than 10 years after the occupancy permit is issued.

Ten years is the outer limit, not a reason to sit on a problem. Most contracts also include a defects liability or maintenance period in the months after handover, and that’s the window where builders expect to come back and fix reported items without much argument. Keep a running list from the day you get the keys, with photos and dates. Email it to the builder. Mentioning it to someone on site doesn’t count for much later.

It’s worth tracking down the plumbing compliance certificate too. Licensed plumbers in Victoria have to issue one for most jobs over $750, and it shows exactly who did the work.

Responsibility shifts to the owner for damage caused after handover. Wipes and cooking fat down the drains, roots from the ornamental tree planted right over the sewer line, a pipe nicked by a fencing contractor. The water authority looks after the meter and the mains in the street, but the pipes running from the meter to the house belong to you once the warranty period has run its course.

If a builder won’t respond, Domestic Building Dispute Resolution Victoria is the free first step before anything turns legal.

When to call a plumber yourself

Some things can’t wait for the builder’s next available slot. A burst flexi hose, sewage backing up into a shower, a hot water unit pouring water from its relief valve. All of those need someone the same day. Pay for the urgent fix, ask for a written report on what caused it, and forward that report to your builder. A licensed plumber’s findings carry far more weight in a warranty claim than a homeowner’s description of what happened.